Commercial Building (Al Fardan Plaza – Range Rover Showroom) (B+G+M+4F) for QCDD Approval
Client: Mr. Hussain Ibrahim Al Fardan
Consultant: Arab Engineering Bureau
Scope of Work: Al Fardan Plaza required closing all the QCDD comments to gain the approval of the Authority for their Company Civil Defence Certification. Multichoice was selected as Smoke Extract, Pressurization and Co2 System Contractor
Supply, Installation, Testing & Commissioning of Smoke Extract and Pressurization System, Co2 System, Ductworks, Electrical and Control System for Basement and Staircase. (Completed - Handed Over)